The Peabody City Council opened the long-delayed hearing on a Tesla vehicle storage lot at 60 Pulaski Street on Thursday, November 12, heard three neighbors speak against it and a fourth object to how the choice was put to them, and continued the hearing to December 10 without a vote on the permit. Four councillors said during the hearing that they could not support it as proposed. On a 10 to 0 vote the council asked the city solicitor for a legal opinion on the alternative the applicant has raised, an oil delivery company that the building commissioner believes could locate on the site without council approval.
In the same meeting the council rezoned 495 Lowell Street for two duplexes, 9 to 0, licensed a 23-table billiards hall on Old County Road, approved $1,177,370 in Community Preservation Act transfers, and voted 7 to 3 to seek a legal opinion on Councillor David Gamache’s proposal for a one-time fee on new construction to pay for streets and sidewalks. Councillor at Large Thomas Rossignoll was absent. Councillor at Large Anne Manning-Martin took part by Zoom, so every vote was by roll call.
This account is drawn from the recording of the meeting on Peabody TV and the council’s meeting packets. What was on the agenda going in is in our preview.
60 Pulaski Street: what the applicant now proposes
Attorney John Keilty, for 60 Pulaski Street Industrial, LLC, told the council the request for an automotive repair shop “has since been dropped” and asked that the record show it. What remains is outdoor storage of new vehicles. Tesla, he said, now parks its surplus new cars on Dunham Road in Beverly and wants to move them closer to its sales and service location at 210 Andover Street. He said the lot would hold about 300 cars, and that in the ordinary course of business it would see no more than four car carriers a week, between 7 a.m. and 5 p.m., with single cars leaving for Andover Street as they are sold. Pressed by Councillor at Large Jon Turco on the arithmetic, Keilty agreed there would be a larger influx of carriers at the start to fill the lot.
Keilty said the owner would accept a permit limited to four years and subject to renewal, and would go back to the Conservation Commission and to site plan review with a plan that removes the roughly 70,000 square feet of buildings already approved for the site. He acknowledged a councillor’s point that the lot “is not going to yield a great deal for the city” and floated an annual payment to a technical program at the high school.
He also said the owner has another prospective tenant, a petroleum delivery company now renting from the same owner in Middleton, which has to leave that site and has “great interest” in Pulaski Street. “It was never mentioned as kind of a threat,” Keilty said. If Tesla does not go forward, he said, the council “will probably see the application” for a building permit from that company.
Neighbors: “painted in a corner”
Kathy Wells of Westview Circle, who said she lives 100 feet from the lot, asked the council to deny the permit. She said the proposal fails the three tests in Section 6.1.2 of the zoning ordinance: it serves no desirable local need, it would harm the character and safety of a neighborhood with a narrow two-lane street, few sidewalks and a school across the street, and it contradicts the Mill Overlay District the council created. “Why did we put this into zoning laws if we choose to disregard it?” she said. Of the oil company, she said, “I felt like we were painted in a corner.”
Wendy Thomas, also of Westview Circle, said the overlay district excludes automobile-related businesses, cited large electric vehicle fires elsewhere and asked whether the Fire Department has the equipment, training and water supply for one. She argued that the city’s own definition of a warehouse operation excludes bulk storage of flammable materials, and that the oil company is “not before you this evening.” The owner bought the property in July 2022 for $1.6 million, she said, when it was already inside the overlay district. “What is the desirable local need?” she said.
A third Westview Circle resident said a fire on the property years ago melted her siding and handed the clerk a petition she said carried 40 signatures against the permit. A Gallant Road resident whose driveway faces the site said he does not oppose Tesla and thinks it makes more sense than oil trucks, but wants the repair shop language struck from the application in writing, is worried about lighting at night, and objected to residents being told “it’s either this or that.”
Councillors: no vote, but several noes
Ward 3 Councillor Stephanie Peach, whose ward includes the site, said at the outset that she would not move the permit and wanted the hearing open so residents and councillors could ask questions. She said she pushed in 2019 to put the lot in the overlay district and still hopes for a use that is not industrial. “I don’t love the Tesla application,” she said. “I think it would clean up the property.” Her concern, she said, is that the building commissioner told her an oil delivery business would be allowed by right as a storage and warehouse use, in which case the council would never see it and a building would go up that would be harder to redevelop later, while a four-year storage permit “leaves the door open.” She said she would condition any approval on no repair facility, on car carriers arriving from South Liberty Street and not idling, and on building the public walkway to the North River that is on the approved plans.
Turco said the lot would bring the city no added tax revenue, citing conversations with the assessor and the finance director, and nothing else. “There’s no benefit to the city at all,” he said. “We assume all the risk.” He also said he disagrees that an oil company fits the warehouse definition. Manning-Martin said the application does not meet Section 6.1.2 and that more than 50 residents have objected. Ward 1 Councillor Craig Welton said the applicant should have come in with concessions on safety or public benefit and that he could not support it as it stands. Councillor at Large Jaclyn Corriveau said dozens of cars 100 feet from a neighborhood is “completely unacceptable” and that she cannot support it. Gamache and Turco both defended Peach for telling residents about the alternative.
Fire Captain Chris Dowling, the department’s fire prevention officer, told the council that firefighters are trained for lithium-ion battery fires and have fought them, including one on an MBTA bus on Washington Street. The practice now, he said, is to let a vehicle in thermal runaway burn out and protect what is next to it, in part with fire blankets. With 300 vehicles, he said, spacing would be a concern, and the department would want conditions requiring Tesla to supply protective equipment.
495 Lowell Street rezoned, with land for the temple
The council voted 9 to 0 to move 495 Lowell Street from the R1B district to R2. Councillor at Large Jarrod Hochman recused himself. Keilty, representing Todisco Properties, LLC, said the Planning Board gave the change a positive recommendation on November 5 and that the owners have reached an understanding with the single-family neighbor on one side and with Temple Tiferet Shalom on the other, under which about 77,000 square feet at the back of the parcel would be given to the temple. The temple’s treasurer told the council the congregation supports the change and that the arrangement is going “in a very positive fashion.” No one spoke against it. Gamache, the Ward 5 councillor, tied the approval to the plan shown to the Planning Board on November 5 locating two duplexes on the lot, and said the plan leaves almost no blasting.
Licenses and other hearings
Amazin Billiards and Pub, LLC, at 23 Old County Road, received an entertainment license and a pool and billiard license for 23 tables, both 10 to 0. Recorded entertainment may run from 10 a.m. to midnight and live entertainment, limited to three pieces, from 6 to 11 p.m. The council also approved, 10 to 0, the transfer of the Class 2 used car license at 98 Foster Street to Intercar Motors Corp. Ward 2 Councillor Wendy Lattof said the company has operated in Everett for five years and nothing about the lot changes but the name.
The hearing on three apartments at 106 Lynn Street was moved to December 10; Welton said there was not yet enough information and another neighborhood meeting will be held. The hearing on the landscaping yard at 15R Mason Street was moved to November 24.
Preservation money: $1.18 million
The Finance Committee, meeting at 7 p.m., approved all six Community Preservation Act requests 5 to 0, and the full council followed 10 to 0 on each: $270,000 and $400,000 toward debt on the golf course and adjoining land purchases, $200,000 as a zero-interest, 30-year deferred loan to the 116-unit affordable housing project at 42R Farm Avenue along with a $170,000 transfer to fund it, $6,350 to restore four memorial plaques and $131,020 for gravestone and fence work in historic cemeteries. Finance Director Michael Gingras presented each. No councillor asked a question.
Gamache’s fee on new construction
The longest debate outside the hearings came on a motion Gamache read from the floor. Any new residential unit receiving an occupancy permit on or after January 1, 2027 would pay a one-time $1,000 fee, including units added to existing buildings and hotel and motel rooms. New commercial or industrial space would pay $2,500 for each 2,500 square feet. The money would go to streets and sidewalks. The state’s Chapter 90 road aid comes to about $1.1 million a year, he said, and the list of sidewalk requests runs to the hundreds. “This is not a tax,” he said.
Turco and Manning-Martin objected that councillors had nothing in writing. Corriveau objected to the idea. “People have voiced their opinions that they cannot afford any more,” she said, adding that during budget season small cuts were dismissed as not adding up. Lattof asked that the 3 percent community impact fee the state allows on short-term rentals, which Peabody does not charge, be looked at too. A motion to cut off debate failed 4 to 6. Gamache agreed to put the text in the packet for the November 24 meeting, and the council voted 7 to 3 to ask the city solicitor in the meantime whether both fees can be imposed and directed to road work. Turco and Manning-Martin voted no. The third no vote cannot be made out on the recording.
Also Thursday
The Board of Health’s letter backing a sustainable food ware and packaging ordinance was sent to the Human Services Committee. Gamache’s motion to draft an ordinance for stop signs on Cider Mill Road at Apple Hill Road and on Princeton at Cider Mill Road passed 10 to 0. Hochman and Lattof reported that the joint council and School Committee panel met November 10 on bus stops and crossing guards, that all but one crossing guard post is filled, and that the superintendent is looking at a substitute list; Hochman’s motion asking the Parks and Recreation Commission to review athletic field permit fees passed 10 to 0.
On Welton’s motions the council approved the city’s Christmas tree bonfire at Tillie’s Farm on January 9, with a rain date of January 10, asked Public Services to cut back brush that he said is forcing students on Lynn Street into the road between Bowen Road and Sunset Drive, and sent the joint panel a proposal to light the football field next to Higgins Middle School for youth football. Hearings will be scheduled on an underground storage tank license at 100 Birney Street and an entertainment license change at Red Tea, 126 Newbury Street. The update that a mattress pickup program is expected in early 2027 was received.
At the end of the meeting Turco said changes to the state zoning act, Chapter 40A, made through this year’s state budget would loosen the standard for variances and allow hearing notices by email, and the council voted 10 to 0 to have Community Development Director Curt Bellavance explain them to the Industrial and Community Development Committee.
What comes next
The council meets again November 24. The 60 Pulaski Street and 106 Lynn Street hearings resume December 10. The recording of the meeting is on Peabody TV’s YouTube channel.



